The short answer

For most commercial kitchens, the floor that lasts is urethane cement or a quartz system, not a standard epoxy coating. Urethane cement handles heat, thermal shock from hot water and steam cleaning, grease and many chemicals, and it tolerates moisture in the slab better than epoxy. It runs about $9 to $15 per square foot, estimated. Quartz systems build a thick, textured floor that gives grip when wet, and run about $9 to $14 per square foot, estimated. Standard epoxy works in dry prep areas, storage and front of house.

What a kitchen floor has to take

  • Heat and thermal shock. Hot water, steam cleaning and hot oil near fryers and ovens.
  • Grease and fats, which make floors slippery and attack weak coatings.
  • Constant water and washdowns every shift.
  • Impacts and loads: dropped pans, carts, racks and heavy equipment.
  • Chemicals: degreasers, sanitizers and cleaning products.
  • Grip. The floor is wet and greasy much of the time, and people move fast.

The systems compared

Urethane cement Quartz system Standard epoxy
Heat and thermal shock Best Good Limited
Grease and chemicals Very good Good Good
Moisture in the slab Tolerates it better Needs control Needs control
Grip when wet Textured finish Textured by design Needs a textured topcoat
Estimated range $9–$15 / sq ft $9–$14 / sq ft $5–$12 / sq ft (commercial)
Best areas Cook line, dish, prep Prep, walk-ins, restrooms Dry storage, front of house

Ranges are Freily estimates for Florida, September 2026.

Details that decide whether it works

  • Drains and slopes. The floor has to carry water to the drains, and the coating has to be detailed around them so water does not get under it.
  • Cove base. Running the floor a few inches up the wall makes a seamless edge that is easier to clean.
  • Texture level. Enough grip for wet, greasy floors, but not so much that the floor becomes hard to mop.
  • Preparation. Old tile, adhesive and grease-soaked concrete have to be removed or treated before anything goes down.

Installing without closing the restaurant

Most restaurants cannot close for a week. We plan the job in sections and work at night or on days the kitchen is closed, so each area is usable before the next service. We tell you the return-to-service time for each section before anything is scheduled.

Next step

See our commercial epoxy flooring page for the quartz and urethane cement systems, or send us the square footage and your operating hours for a plan and a quote.